1 / 9
$36.00
✅Tax Included and Free Shipping✅15-day returns and exchanges

[Secret of the S-curve] Smooth mesh hip-lifting and tummy-control pants

Color
Size
Quantity
[Secret of the S-curve] Smooth mesh hip-lifting and tummy-control pants
Color: Black, Nude
● Crafted with advanced mesh fabric, these pants offer exceptional breathability while lifting your hips and smoothing your tummy for a flawless silhouette.
● Innovative S-curve design contours your curves, providing targeted support and shaping to enhance your natural figure with every wear.
● Features a seamless, high-waisted fit that stays in place all day, ensuring comfort and confidence whether at work, the gym, or out on the town.
● Durable, stretch-resistant material maintains its shape wash after wash, giving you reliable tummy control and hip-lifting benefits over time.

Cart

loading